Cost

  • Time is money! Helical Piles take much less time to install than other deep foundation technologies.
  • They can be installed in most weather conditions and through all four seasons of the year. This saves money and cost from delays that weather conditions can cause.
  • They can be loaded immediately after installation. There is no cure time so rebar and concrete can be started immediately behind the anchor install (Compared to Caisson which needs to meet a minimum compressive strength before you can continue with construction).
  • Installation produces no spoils to remove or remediate, saving time and money.